Meanwhile, Indian authorities refused to be separated from the package-Kamala diversion Saptakoshi

KATHMANDU, May 17. Nepal-India Joint Technical Committee (JST) to the fifth meeting held in New Delhi on Friday-Kamala Diversion Meanwhile, Koshi High Dam has rejected a joint study to separate India.

Meanwhile, Nepal Koshi High Dam-Cynthia deleted package itself was proposed by India to study and start building.

Meanwhile, the Indian side agreement, the two countries hold ministerial-deceased requirement within the material being rejected by the mandate jeesatisiko lead the Nepali delegation said that the Irrigation Ministry Secretary Madhav Belbase.

SHARE THIS

Author:

Previous Post
Next Post